Join Engormix and be part of the largest agribusiness social network in the world.
153 views
Jason Buseman
See:
Article published the May 23, 2014
When designing a plant, it is important to consider the flow of material during a given time. This is the “mass flow rate” and is important when specifying equipment capacities for conveying and bins. Under sizing equipment will cause bottlenecks in production while over sizing equipment could result in overpaying for equipment much larger than required. The following can be used to ca ...
remove_red_eye 453
forum 0
Engormix
This member had joined Engormix
May 23, 2014
equalizer Statistics: Articles(1)
Information
Location:Johnston, Iowa, Estados Unidos de América
Profile: Professional
Professional Title: Ingeniero de Procesos
Followers (7)