When designing a plant, it is important to consider the flow of material during a given time. This is the “mass flow rate” and is important when specifying equipment capacities for conveying and bins. Under sizing equipment will cause bottlenecks in production while over sizing equipment could result in overpaying for equipment much larger than required. The following can be used to ca ...